Project name: Construction of the Fitideo Sports Center in Limassol

Terms: January 2007 - July 2010

Customer - Municipality of the city of Limassol, Cyprus
The general contractor is ZEMCO Group ZEMCO Group
Special Structural Contractor - Themeliotechniki ARGYRIDES POLYS THEMELIOTECHNIKI CO LTD
Appointed Structural Laboratory - Sourmelis Geotechnical Laboratories Sourmelis Geotechnical Laboratories
Contract cost: EUR 1,200 million

Work completed by GWCD under this project:
  • Construction of a circular multi-level cycle path of 500 m in length and 8 m wide
  • construction of a concrete foundation for a bicycle track on bale piles including (creation of a reinforcing frame of a foundation, basement beams, including bending of shapes in accordance with the drawings, binding of valves with a diameter of up to 24 mm) - 90 tons
  • construction of supporting scaffolds at bridge overflow - 300 000 cubic meters installation of formwork, at an altitude of 3 to 10 meters 6000 square meters. m
  • pouring of concrete into the formwork -320 cubic meters. m
  • removal of formwork and supporting scaffolding and surface cleaning of concrete
  • 04/11/2006
  • 04/11/2006
  • 24/03/2007
  • 05/04/2007
  • 05/04/2007
  • 05/04/2007
  • 07/07/2007
  • 07/07/2007
  • 07/07/2007
  • 12/07/2007
  • 12/07/2007
  • 12/07/2007
  • 12/07/2007

GWCD offices

Cyprus office:

Greece office:

Ukraine office:

26, N.Pattichi Str
Limassol, 3308, Cyprus
e-mail: This email address is being protected from spambots. You need JavaScript enabled to view it.
Mr.Mavrikios Leonidou
Z.Papantoniou, 5
Thessaloniki, 54646, Greece
e-mail: This email address is being protected from spambots. You need JavaScript enabled to view it.
Mr.Borys Grebnevskyi
77, Avtostradna Str
Zaporizhzhe, 69083, Ukraine
e-mail: This email address is being protected from spambots. You need JavaScript enabled to view it.
Mrs.Sophiia Myliushko