Project name: Upgrading of two roundabouts near Limassol, on the highway Nicosia-Paphos, Cyprus
Terms: June 2004 - December 2008
Terms: June 2004 - December 2008
Customer - Ministry of Transport, Communications and Works, Republic of Cyprus
General contractor - Iacovou Group
Special Structural Contractor - ARGYRIDES POLYS THEMELIOTECHNIKI CO LTD
Appointed Structural Laboratory - Sourmelis Geotechnical Laboratories
Contract cost: EUR 18 million
Work completed by GWCD under this project:
- construction of supporting scaffolds at bridge overflow - 2400 cubic meters
- installation and reinforcement of the formwork for filling the span of the bridge - 5700 sq. m
- Removing the formwork and dismantling the support scaffold
- construction of retaining walls up to 5 meters high (binding of fittings, installation of
- formwork, concrete pouring, formwork removal, surface cleaning of concrete) - 2000 sq.m
- construction of two underground passages - a total length of 180 meters
- stacking of stamped concrete - 1020 sq. m
- laying a curb stone 5500 meters
- construction of the pavement (preparation of a trough, filling and gravel crushing,
- filling with cement mortar and laying paving slabs) - 3200 sq.m
- installation of fencing structures of pavements - 1550 meters
- Mounting of acoustical barriers 4600 meters
- installation of storm sewerage and bridge engineering networks