Project name: Construction of underground parking and the complete reconstruction of Old Bridge Hotel - Limassol, Cyprus
Terms: January 2007 - July 2009
Terms: January 2007 - July 2009
Customer - A.Trifonos Group
General Contractor - A. Tryfonos Estates & Constructions
Contract cost: EUR 3 million
Work completed by GWCD under this project:
- building cleaning from furniture, air conditioners and engineering networks to the level of a concrete frame with external walls
- restoration of damaged elements of a concrete frame of a building using chemical and mechanical components
- 60 * 120 meters underground parking trough preparation on the ground of existing parking
- creation of reinforcement framework of the foundation, foundation beams, columns, walls and ceilings including bending of shapes according to the drawings, binding of ammature with a diameter up to 24 mm) - 40 tons
- installation of formwork, pouring concrete into the formwork, removing formwork and scouring the concrete surface
- construction of new inner walls of ceramic brick and drywall laying of new engineering networks, with wall decoration: electricity, water, air conditioners
- plastering, painting work inside and outside the building, laying tiles, installation of air conditioners (split systems and central air conditioning), plumbing
- asphalting an adjoining territory and ground parking area of 1000 square meters. m
- Reconstruction of the existing swimming pool 10 * 12 m with the replacement of the glued floor of the pool